Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Permits

Allen County American II Wastewater Treatment Plant (WWTP)

oepa-2PH00006-american-ii-fact-sheet
[verified]
↩ seen in the story Chapter 04 · What it does to the waterresume the story ›
Fields
facility_name
Allen County American II Wastewater Treatment Plant (WWTP)
permit_no
2PH00006*LD
permit_action
renewal
applicant
Allen County Board of Commissioners, 3230 North Cole Street, Lima, OH 45801
application_no
OH0037338
public_notice_no
211697
public_notice_date
2025-04-28
comment_period_end
2025-05-28
facility_address
American II WWTP, 4140 Diller Road, Lima, OH 45807, Allen County
discharge_address
receiving_water
Dug Run
stream_network
Ottawa River, Auglaize River, Maumee River, Maumee Bay, Lake Erie
note
Revised Final June 2025. Permit action described as renewal throughout. Outfall 001 referenced in tables and text (e.g., Table 12, influent monitoring station 601). No discharge address distinct from facility address.
outfalls
  • 001
oepa/oepa-2PH00006-american-ii-fact-sheet.npdes.yaml · p.1 · oepa

How we read it. The block above is the answer; the teardown below is the working — the same record, slowed down so the figure can be checked.

The teardown · run on this id
flow
Record Teardown

NPDES fact sheet — the 7Q10 screen

Ohio EPA · American II WWTP · permit 2PH00006 (Dug Run)
● in the published bundle
Permit fact sheet · text-native
① The source

Your browser can’t display this PDF inline.

Open the in-browser reader

Rendering oepa-2PH00006-american-ii-fact-sheet.pdf

Download · Open in a new tab

Stream Flows table · Ohio EPA · NPDES fact sheets
7Q10 values are read from the Ohio EPA fact sheets committed in the corpus; the fact-sheet PDFs are available on request.
② What we read from it
Receiving water
Dug Run · impaired
7Q10 design low flow
0.78 cfs
1Q10 (driest week)
0.6 cfs
Summer 30Q10
0.96 cfs
Stated acute dilution
1.3 : 1
Ottawa mainstem 7Q10
0.2 cfs
Ottawa 1Q10 (driest week)
0 cfs · nearly dry
● figures read live from the published record · ~ markers preserved as approximate
③ What it reveals

Ohio EPA sizes every discharge against the stream's design low flow — and the Ottawa this project discharges into runs at just 0.2 cfs, dropping to zero in the driest weeks. The tributaries are worse: American II's own fact sheet states a dilution of barely 1.3 to 1. The receiving water is near-undiluted before this project adds a drop.

④ How to check it
[verified]fact-sheet 7Q10
Record Teardown

NPDES fact sheet — the 7Q10 screen

Ohio EPA · American II WWTP · permit 2PH00006 (Dug Run)
● in the published bundle
Permit fact sheet · text-native
① The source

Your browser can’t display this PDF inline.

Open the in-browser reader

Rendering oepa-2PH00006-american-ii-fact-sheet.pdf

Download · Open in a new tab

Stream Flows table · Ohio EPA · NPDES fact sheets
7Q10 values are read from the Ohio EPA fact sheets committed in the corpus; the fact-sheet PDFs are available on request.
② What we read from it
Receiving water
Dug Run · impaired
7Q10 design low flow
0.78 cfs
1Q10 (driest week)
0.6 cfs
Summer 30Q10
0.96 cfs
Stated acute dilution
1.3 : 1
Ottawa mainstem 7Q10
0.2 cfs
Ottawa 1Q10 (driest week)
0 cfs · nearly dry
③ What it reveals

Ohio EPA sizes every discharge against the stream's design low flow — and the Ottawa this project discharges into runs at just 0.2 cfs, dropping to zero in the driest weeks. The tributaries are worse: American II's own fact sheet states a dilution of barely 1.3 to 1. The receiving water is near-undiluted before this project adds a drop.