Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Lenses · 04 of 5

Economy

What did it cost the public, and what came back?

Both sides of the ledger, each cited to the instrument that created it: the abatement and the PILOT on one side, and on the other the local employment baseline the jobs claim has to be measured against.

A lens is a standing view, not a thesis: it has no verdict to reach, so nothing below scores or ranks a site. Every column counts rows in that site's own exported bundle.

Across the network
On the record 8 Not on the record here 0 No bundle committed yet 30
Reads economics-baselinegreenops

What this lens gathers on a site

1 existing page, shown here against the reference build. A lens is a view over these routes, not a new store — the URLs are unchanged, and each still gates on its own section's readiness.

Cross-site scorecard

Every site, on this dimension

8 of 38 registered sites carry a record on this lens. The rest are named below rather than omitted.
SiteWatershed pointBuild phaseLabor baselineCarbon & water use
Labor baseline — the localized BLS QCEW / Census employment baseline a jobs claim is measured against. Carbon & water use — the GreenOps sustainability read. Every figure is read from the site's own exported bundle at build time. A dash means no bundle is committed yet — nothing measured; a zero means the export ran and the site carries none. A lens reaches no verdict, so none of these columns ranks a site.

Columns: Labor baseline · Carbon & water use.