Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
Section · the record

The source record

Everything the project is built from — documents, the structured records read from them, the timeline, people & places, the legal history, external reference datasets, and the environmental data.

3,382 source files indexed
What the record holds Open the timeline →

3,382 source files across 21 collections, read into 160 structured records and 232 dated events spanning 1994–2026. 137 of those records carry a transcription warning — read them against the page they came off.

Counted from this site's own documents / records / timeline feeds, exported 2026-09-04. Nothing here is carried over from another site.