Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
Lens 03 of 5

Environment

What does it take from and put into the ground, water, and air?

Ottawa River · Lima, OH
The reading right now Open the water screen →

Ottawa River runs at 0.20 cfs when the drought design condition bites — and the campus's modeled buildout draw of 4.9 cfs is 24× the whole river at that floor. Downstream it is already 97% treated effluent.

Design low flow
0.20
Annual 7Q10
Buildout draw
4.9
3.92 MGD cooling
Effluent share
97
at design low flow

Every figure from this site's hydrology-scenarios feed — the cited design low flows, and the modeled buildout draw. feed assimilative (NPDES fact sheets) + the campus's cited routed discharge (hydrology-scenarios).

Withdrawal, discharge, drawdown, runoff, heat, and toxics — the receiving water and air, screened against the criteria that actually govern them. Where the record brackets a figure rather than settling it, the bracket stands as the answer.