Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building

Watershed

2 documents · 1.1 MB · 1 of 2 extracted · catalogued from data/documents/watershed/

**Collection:** `watershed/` · **Method:** captured web evidence + (future) primary grant docs

File Type Size Access Extraction
osu-lima-ag-runoff.allenswcd.2026-06-06.pdf pdf 635 KB dev-only extracted
shedekar-cv.2025-09-28.pdf pdf 465 KB dev-only