Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building

Regulatory

4 documents · 4.3 MB · 1 of 4 extracted · catalogued from data/documents/regulatory/

**Collection:** `regulatory/` · immutable source evidence

File Type Size Access Extraction
OHC000006.pdf pdf 2.3 MB dev-only extracted
OHC000006_RTC.pdf pdf 1.2 MB dev-only
allen-co-cwa-consent-decree-1996.pdf pdf 748 KB dev-only
allen-co-sanitary-cna-2005.pdf pdf 141 KB dev-only