Watermark.
Bowling Green · Middleton Twp
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

How the record was assembled — and withheld

5 events, cause → consequence — each traceable to the extraction that supplied it, the evidence node colored by its citation. Every beat carries its standing: verified events are sourced; open events mark where the record is still being fought for. The order is the argument: the confidentiality went on before the public ever heard the name.

2022
2022-02-22 npdes public notice [verified]
NPDES 2PD00009*TD (Bowling Green Water Pollution Control (WPC)) — public notice
action renewal; receiving Poe Ditch
2022-03-25 npdes comment deadline [verified]
NPDES 2PD00009*TD (Bowling Green Water Pollution Control (WPC)) — comment period ends
2025
2025-12-08 epa permit action [verified]
Air Permit-to-Install (Division of Air Pollution Control), Northwest District Office P0139272 — application preliminarily and administratively complete (Apollo Power Generation Facility)
affected air
2026
2026-03-05 epa permit action [verified]
Air Permit-to-Install (Division of Air Pollution Control), OAC Chapter 3745-31 P0139272 — draft permit issued for public comment (Apollo Power Generation Facility)
affected air
2026-06-02 epa permit action [verified]
Air Permit-to-Install (Division of Air Pollution Control), OAC Chapter 3745-31 P0139272 — final permit issued (Apollo Power Generation Facility)
affected air