5 events, cause → consequence — each traceable to the
extraction that supplied it, the evidence node colored by its citation.
Every beat carries its standing: verified events are sourced; open events
mark where the record is still being fought for. The order is the
argument: the confidentiality went on before the public ever heard
the name.
2022
2022-02-22npdes public notice [verified]
NPDES 2PD00009*TD (Bowling Green Water Pollution Control (WPC)) — public notice
action renewal; receiving Poe Ditch
2022-03-25npdes comment deadline [verified]
NPDES 2PD00009*TD (Bowling Green Water Pollution Control (WPC)) — comment period ends
2025
2025-12-08epa permit action [verified]
Air Permit-to-Install (Division of Air Pollution Control), Northwest District Office P0139272 — application preliminarily and administratively complete (Apollo Power Generation Facility)
affected air
2026
2026-03-05epa permit action [verified]
Air Permit-to-Install (Division of Air Pollution Control), OAC Chapter 3745-31 P0139272 — draft permit issued for public comment (Apollo Power Generation Facility)
affected air
2026-06-02epa permit action [verified]
Air Permit-to-Install (Division of Air Pollution Control), OAC Chapter 3745-31 P0139272 — final permit issued (Apollo Power Generation Facility)