Meta's announced water figure and the district's design commitment differ by twelve times
Two figures for the same campus. Meta's own announced operational use is ~50,000 gpd; the Northwestern Water and Sewer District's linked design commitment is ~600,000 gpd. #1439 recorded both, preferred neither, and left the conflict open by instruction. #1685 then showed why it cannot be closed from the environmental record at all — the campus BUYS finished water, so the ODNR withdrawal registry (which meters withdrawals from waters of the state) and the NPDES record (which covers discharges to them) are both structurally blind to it. The two documents that would settle it are held by two different bodies — the service agreement and the campus meter are the District's, the wholesale contract is the City's — and neither body holds both. Meta's 2026-01-07 letter to the Middleton Township trustees adds a third characterization and no number at all, saying operational water use is "anticipated to be less than what approximately two full-service restaurants use annually". Note the arithmetic trap flagged in #1685 — the City PWS's own 2024 reported returns of 220.84 MG is ~0.605 MGD, a decade-old backwash series that is NOT the disputed 600,000 gpd.