The gap inventory
Every gap this study names, with the record that would close it and where to send it.
This page collects every ask the study makes: 6 gaps named across 6 chapters. Each ask names a public record that an office could produce tomorrow. Each is the same ask the site's leads board already tracks, never a second copy of it. An absence on this page is a finding, not a locked door.
What this study cannot compute yet
A real impact study would report how much heat the discharge adds to a reach screened against Ohio's numeric temperature criterion at its design low flows. [open]
Computing it requires a thermal characterization for this project — none exists on the record.
A real impact study would report the wells within the drawdown radius, and whether construction dewatering was permitted and where the water went. [open]
Computing it requires a well survey and any dewatering record — neither has been produced.
A real impact study would report the runoff a campus-scale impervious surface adds to the design storm, routed down the reach. [open]
Computing it requires the site grading and drainage plan — requested, not produced.
A real impact study would report the dispersion footprint of the campus's permitted backup-generator fleet. [open]
Computing it requires an air-permit application for this project — none is on the record.
A real impact study would report the campus's share of the serving utility's, balancing authority's, and state's annual load, from a grounded load figure. [open]
Computing it requires an instrument that grounds the IT load — an air permit or an interconnection filing; the load on the record is a screening bracket.
A real impact study would report what tax revenue is being traded away and for how long, before the trade is approved. [open]
Computing it requires the county auditor's abatement report and the year-by-year exemption ledger — public records, none produced into this record. Where the agreement itself is on the record it states the TERMS of the trade, never its cost to the taxing bodies.
The site's open questions beyond these chapters
- [open] Meta's announced water figure and the district's design commitment differ by twelve times data/extracted/bowling-green/water-watch.yaml · data/reference/oepa/cooling-reconciliation.yaml · data/documents/bowling-green/middleton-township/Meta-Middleton-Township-Letter-010726.pdf
- [open] Why was a 350 MW power plant certified with no public hearings? data/extracted/bowling-green/power-watch.yaml · data/extracted/grid/bowling-green/apollo-power-generation-facility.yaml
- [open] Where does Apollo's gas come from, and under which unfiled lateral cases? data/extracted/bowling-green/power-watch.yaml
- [open] The campus is designed for at least five buildings, and only two are on a schedule data/extracted/bowling-green/middleton-township/project-accordion-township-record.md · data/extracted/bowling-green/data-centers.md · data/extracted/grid/bowling-green/apollo-power-generation-facility.yaml
- [open] The referendum window on the thirteen-parcel rezoning closed on or about 2026-08-06 data/extracted/bowling-green/record-watch.yaml · data/documents/bowling-green/middleton-township/07072026_specialrezoning.pdf
- [open] Who is the end user of the Oppidan colocation building in the city? data/extracted/bowling-green/data-centers.md · data/reference/bowling-green/parcel-assemblage.geojson
- [open] Liames, LLC's organizers, statutory agent and formation date are unread data/extracted/bowling-green/record-watch.yaml · data/extracted/bowling-green/land-assembly.yaml
- [open] Who sold the 775 acres, and when did the first deed record? data/extracted/bowling-green/land-assembly.yaml
- [open] Five of the thirteen rezoned parcels stood in other names in the county's own layer data/extracted/bowling-green/middleton-township/2026-07-07-liames-rezoning.resolution.yaml · data/extracted/bowling-green/land-assembly.yaml
- [open] The executed CRA agreement and the three school compensation agreements are unread data/extracted/bowling-green/commissioners/2023-09-28-liames-cra.resolution.yaml
- [open] Abbott's $536M nutrition plant is committed and has not broken ground data/extracted/bowling-green/data-centers.md · City of Bowling Green Agenda Center (agendas of 2024-11-13 and 2026-04-01)
- [open] A city that wholesales water to its neighbours is studying how to buy some from Toledo data/extracted/bowling-green/water-watch.yaml
- [open] Why was the municipal utility pursuing an electric easement at the campus corner? data/documents/bowling-green/middleton-township/01152025.pdf
- [open] Seven townships have adopted data-center moratoriums and none of the resolutions is in the corpus data/extracted/bowling-green/record-watch.yaml · data/documents/bowling-green/middleton-township/01072026.pdf
- [open] The data center has its own backup generators and no permit for them is in the corpus data/documents/bowling-green/middleton-township/Meta-Middleton-Township-Letter-010726.pdf · data/extracted/bowling-green/record-watch.yaml
- [open] A resident raised campus dewatering at the rezoning hearing and the applicant had no answer data/documents/bowling-green/middleton-township/07072026_specialrezoning.pdf · data/reference/ohio-water-withdrawal/wood.yaml
- [open] A behind-the-meter campus says it is paying for transmission lines data/documents/bowling-green/middleton-township/Meta-Middleton-Township-Letter-010726.pdf · data/extracted/grid/bowling-green/serving-utility.yaml · data/extracted/grid/bowling-green/firstenergy-dct-tariff-posture.yaml
- [open] Both county planning commission tallies on the 2026 rezonings are press, not record data/extracted/bowling-green/planning-commission/2026-liames-and-schaller-rezoning-applications.resolution.yaml
The full board, with lifecycle and filters, is at open leads and open questions.
Sections of the site still awaiting a source
Distinct from the study's gaps: these are whole sections of the record that have not opened yet — the needs board's asks, not the study's.