Grid
3 documents · 11.0 MB · 2 of 3 extracted · catalogued from data/documents/grid/
**Collection:** `grid/` · immutable source evidence
Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.
3 documents · 11.0 MB · 2 of 3 extracted · catalogued from data/documents/grid/
**Collection:** `grid/` · immutable source evidence
No documents match these filters.
| File | Type | Size | Access | Extraction |
|---|---|---|---|---|
| TE-2026-Electric-Service.pdf | 8.2 MB | ● published | extracted | |
| eei-large-load-projects-and-tariffs-july-2026.pdf | 401 KB | ● published | — | |
| power-siting-board-ohio-020326.pdf | 2.4 MB | ● published | extracted |