Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Plans

American Industrial Park Site

LMA1A-95-SPS-2025-10-28
[verified]
Fields
project_name
American Industrial Park Site
sheet_id
1A-C-3104
discipline
Grading & Storm Plan
phase
95% SPS Design
scale
1" = 30'
project_no
US0047417.9689
site_address
Lima, OH 45801
date
2025-10-28
status
Not For Construction
note
summary
This sheet (1A-C-3104) is a Grading & Storm Plan for the American Industrial Park Site in Lima, OH, prepared at 95% SPS Design and marked Not For Construction. It depicts proposed grading, storm sewer infrastructure, sanitary and water mains, fiber duct bank, electric services, security fencing with anti-ram barriers, and containment areas. The site includes elevated SSS and GPS buildings on structural piers, with finished floor/top-of-pad elevations referenced at 828.75 (NAVD88 + 800 offset).
prepared_by
    • name EMH&T
    • discipline Civil
    • location 5500 New Albany Road, Columbus, OH 43054
    • name CI Design, Inc
    • discipline Architecture
    • location 250 Summer Street, Boston, MA 02210
    • name WSP USA Buildings Inc.
    • discipline MEP / Structure
    • location 433 River Street, 7th floor, Troy, NY 12180
key_features
  • Grading & storm drainage plan
  • Storm sewer system
  • Sanitary sewer main
  • Water main (domestic and fire water service)
  • Fiber duct bank / fiber trench
  • Underground electric service / electric trench / overhead electric
  • Underdrain
  • Transformer
  • Catch basin / curb & gutter inlet / inlet manhole
  • Headwall with rock channel protection
  • Proposed security fence (permanent and temporary)
  • Anti-ram barrier
  • MYD structural foundation pad
  • Containment area
  • Major flood routing / drainage flow direction
  • Rock check dam
  • Post indicator valve / fire hydrant
  • Fire department connection
  • Overall limits of disturbance
  • SSS and GPS buildings on piers (elevated above surrounding grade)
⚠ Gaps in the record
  • OCR digit reliability is noted as low — rim and pad elevations (e.g. RIM=828.75, PAD=28.75) have been transcribed as-is but should be field-verified against the drawing.
  • Sheet drawn/approved initials were not legible in OCR; left blank.
Where it connects
plans/LMA1A-95-SPS-2025-10-28.plan.yaml · p.1 · plans