Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Permits

Shawnee II WWTP

oepa-2PK00002-shawnee-ii-draft-pn-2026-03
[verified]
Fields
facility_name
Shawnee II WWTP
permit_no
2PK00002*MD
permit_action
renewal
applicant
Allen County Sanitary Engineering Department
application_no
OH0023850
public_notice_no
219931
public_notice_date
2026-03-24
comment_period_end
2026-04-23
facility_address
3640 Spencerville Road, Lima, OH 45805, Allen County
discharge_address
Ottawa River at River Mile 32.5
receiving_water
Ottawa River
stream_network
Ottawa River
note
outfalls
  • 001
⚠ Gaps in the record
  • Comment period end date (2026-04-23) is calculated as 30 days after public notice date (2026-03-24); not explicitly stated in the document.
  • Public notice date year is 2026 — verify this is not a typo for 2024 or 2025.
  • Permit action inferred as 'renewal' based on document referencing a renewal application; not explicitly labeled as such on the permit face.
Where it connects
oepa/oepa-2PK00002-shawnee-ii-draft-pn-2026-03.npdes.yaml · p.1 · oepa