Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Permits

American II Wastewater Treatment Plant

oepa-2PH00006-american-ii-draft-pn-2025-04
[verified]
Fields
facility_name
American II Wastewater Treatment Plant
permit_no
2PH00006*LD
permit_action
renewal
applicant
Allen County Board of Commissioners, 4140 Diller Road, Lima, OH, 45807
application_no
OH0037338
public_notice_no
211697
public_notice_date
2025-04-28
comment_period_end
2025-05-28
facility_address
4140 Diller Road, Lima, OH, 45807, Allen County
discharge_address
receiving_water
Dug Run at River Mile 3.1
stream_network
note
Comment period end is 30 days after public notice date (2025-04-28), calculated as 2025-05-28. Stream network downstream of Dug Run not stated. Nature of business: Municipal Wastewater Treatment Plant. Design flow: 1.2 MGD. Outfall station number listed as 2PH00006001.
outfalls
  • 001
⚠ Gaps in the record
  • Comment period end date (2025-05-28) is calculated as 30 days after public notice date; not explicitly printed.
  • Stream network beyond Dug Run not stated in document.
  • permit_action inferred as 'renewal' based on the document referencing a 'timely submitted NPDES permit renewal application'.