Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Permits

Project Bosc Lvl 2 IWP

3969235
[verified]
Fields
agency
Ohio EPA
program
Isolated Wetland Permit
permit_no
DSW401252260W
action
incomplete
action_date
2026-01-13
plans_received_date
2025-12-09
expiration_date
applicant
Bistrozzi LLC
applicant_address
2801 Centervillle Rd., Wilmington, DE 19808
contact_name
Jill Tangeman
contact_email
jstangeman@vorys.com
contact_firm
Vorys
project_name
Project Bosc Lvl 2 IWP
site_address
North of W. Bluelick Road, east of N. Cole Street, and west of State Route 65, American Township and Sugar Creek Township, Allen County, Ohio
affected_resource
Isolated wetland (Category 2 forested wetland)
parcel_ids
note
Letter notifies applicant that the Level Two Isolated Wetland Permit application remains INCOMPLETE as of January 13, 2026 — a second incomplete notice following the applicant's January 6, 2026 response to the original December 23, 2025 incomplete determination. Ohio EPA ID No. 252260W. Project is to construct a data center facility (coordinates 40.795845, -84.123601). EMH&T (Melissa Darby, mqueendarby@emht.com) is copied as the engineering firm. The OCR reads "December 23, 2026" for the first incomplete determination date, which is clearly a typo for December 23, 2025 based on context.
⚠ Gaps in the record
  • Applicant address contains a likely OCR/typo: '2801 Centervillle Rd.' has triple-l; copied exactly as printed.
  • OCR and letter body state the application was found incomplete on 'December 23, 2026' — this is almost certainly a typo for December 23, 2025 given the surrounding dates.
  • The Re: block lists both 'Permit - Intermediate Correspondence' and '401 Wetlands' — program recorded as Isolated Wetland Permit per subject line and body text.
  • Contact firm inferred as Vorys from the email domain jstangeman@vorys.com; not explicitly stated in the letter.
Where it connects
permits/3969235.epa.yaml · p.1 · permits