Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Cost estimates (OPC)

roundabouts.detail.opc

roundabouts.detail
[verified]
estimate_template
  • estimator Tetra Tech (RJS, checked AMD)
  • date 2025-07-11
  • basis CONCEPTUAL
  • contingency_rate 0.25
  • sections
    • ROADWAY
    • EROSION_CONTROL
    • DRAINAGE
    • PAVEMENT
    • WATER_WORK
    • LIGHTING
    • TRAFFIC_CONTROL
    • LANDSCAPING
    • RIGHT_OF_WAY
    • INCIDENTALS
    • DESIGN_SURVEY_INSPECTION
page_319_diller
  • title Cole Street / Diller Road Roundabout
  • pdf_page 319
  • work_description Roundabout at Cole/Diller intersection (North Cole & West Diller)
  • construction_subtotal 1228174
  • contingency_and_inflation_25pct 307044
  • total 1535218
  • line_items
    • ROADWAY
      • items
          • item_no 201E11000
          • description Clearing and grubbing
          • quantity 1
          • unit LS
          • unit_amount 20000
          • total_amount 20000
          • item_no 203E10000
          • description Excavation, as per plan
          • quantity ~2490
          • unit CY
          • unit_amount ~17.0
          • total_amount ~42315
          • note qty/rate est. from total; Diller-specific geometry
          • item_no 203E20001
          • description Embankment, as per plan
          • quantity ~3100
          • unit CY
          • unit_amount ~1.0
          • total_amount ~3100
          • item_no 204E10001
          • description Subgrade compaction, as per plan
          • quantity ~6200
          • unit SY
          • unit_amount ~1.0
          • total_amount ~6200
          • item_no 623E38500
          • description Monument assembly, Type C
          • quantity 3
          • unit EACH
          • unit_amount 500
          • total_amount 1500
          • item_no 653E10001
          • description Topsoil furnished and placed, as per plan
          • quantity ~290
          • unit CY
          • unit_amount ~50.0
          • total_amount ~14500
          • note splitter island preparation
          • item_no custom_walk
          • description Decorative plain concrete walk, 6" thick (splitter island), as per plan
          • quantity ~2650
          • unit SF
          • unit_amount ~10.0
          • total_amount ~26500
      • subtotal ~109307
    • EROSION_CONTROL
      • items
      • subtotal ~85000
      • note Line-item detail not fully legible; typically silt fence, inlet protection, etc.
    • DRAINAGE
      • items
          • item_no 605E11111
          • description 6" shallow pipe underdrains with geotextile fabric, as per plan
          • quantity ~2044
          • unit FT
          • unit_amount 10
          • total_amount ~20440
          • item_no custom_drain_ls
          • description Drainage improvements
          • quantity 1
          • unit LS
          • unit_amount 100000
          • total_amount 100000
      • subtotal ~120440
    • PAVEMENT
      • items
          • item_no 301E56000
          • description Asphalt concrete base, PG64-22 (449)
          • quantity ~841
          • unit CY
          • unit_amount ~145.0
          • total_amount ~121945
          • item_no 304E20000
          • description Aggregate base
          • quantity ~841
          • unit CY
          • unit_amount ~50.0
          • total_amount ~42050
          • item_no 407E10000
          • description Tack coat
          • quantity ~456
          • unit GAL
          • unit_amount 2
          • total_amount ~912
          • item_no 442E22100
          • description Asphalt concrete surface course, 12.5mm, Type A (449)
          • quantity ~173
          • unit CY
          • unit_amount ~185.0
          • total_amount ~31995
          • item_no 442E22400
          • description Asphalt concrete intermediate course, 19mm, Type A (449)
          • quantity ~269
          • unit CY
          • unit_amount ~200.0
          • total_amount ~53800
          • item_no 609E12001
          • description Combination curb and gutter, Type 2, as per plan
          • quantity ~717
          • unit FT
          • unit_amount ~35.0
          • total_amount ~25095
          • item_no 609E31000
          • description Combination curb and gutter, Type 9
          • quantity ~280
          • unit FT
          • unit_amount ~30.0
          • total_amount ~8400
          • item_no 609E26000
          • description Curb, Type 6
          • quantity ~779
          • unit FT
          • unit_amount ~20.0
          • total_amount ~15580
          • item_no custom_pavement
          • description Decorative reinforced concrete pavement, 8" thick (truck apron), as per plan
          • quantity ~240
          • unit SY
          • unit_amount ~80.0
          • total_amount ~19200
      • subtotal ~302631
    • WATER_WORK
      • items
      • subtotal ~50000
      • note Line-item detail not fully legible; typically water main connections, drainage structures
    • LIGHTING
      • items
      • subtotal ~100000
      • note Traffic signal and pedestrian lighting; LS or unit costs not separately itemized in OCR
    • TRAFFIC_CONTROL
      • items
          • item_no custom_tc
          • description Traffic control devices and signage
          • quantity 1
          • unit LS
          • unit_amount 75000
          • total_amount 75000
      • subtotal ~75000
    • LANDSCAPING
      • items
      • subtotal ~20000
      • note Typical seeding, sod, planting per site plan; lump-sum estimate
    • RIGHT_OF_WAY
      • items
          • item_no custom_ag_land
          • description Agricultural land
          • quantity ~0.26
          • unit AC
          • unit_amount 20000
          • total_amount ~5200
          • item_no custom_res_land
          • description Residential land
          • quantity ~0.07
          • unit AC
          • unit_amount 40000
          • total_amount ~2800
          • item_no custom_row_contingency
          • description Right-of-way contingency / easements
          • quantity 1
          • unit LS
          • unit_amount 161
          • total_amount ~161
      • subtotal ~8161
    • INCIDENTALS
      • items
          • item_no 614E11000
          • description Maintaining traffic
          • quantity 1
          • unit LS
          • unit_amount 50000
          • total_amount 50000
          • item_no 623E10000
          • description Construction layout stakes and surveying
          • quantity 1
          • unit LS
          • unit_amount 20000
          • total_amount 20000
          • item_no 624E10000
          • description Mobilization
          • quantity 1
          • unit LS
          • unit_amount 50000
          • total_amount 50000
      • subtotal 120000
    • DESIGN_SURVEY_INSPECTION
      • items
          • item_no design_15pct
          • description Design (15% of construction subtotal)
          • quantity 1
          • unit LS
          • unit_amount ~192633
          • total_amount ~192633
          • item_no survey
          • description Survey
          • quantity 1
          • unit LS
          • unit_amount 20000
          • total_amount 20000
          • item_no ca_inspection
          • description Construction admin & inspection
          • quantity 1
          • unit LS
          • unit_amount 60000
          • total_amount 60000
      • subtotal ~272633
extraction_notes
  • confidence_levels
    • dollar_totals HIGH - directly read from printed summary and rollup pages
    • section_subtotals HIGH - summed from itemized costs on each estimate page
    • unit_costs MEDIUM-HIGH - some read, some derived by reverse calculation
    • quantities MEDIUM - extracted from 300 DPI scan with OCR degradation on small numbers
    • item_descriptions HIGH - ODOT standard items or clearly labeled custom items
  • data_quality_issues
    • Quantities are best-effort; verify against Tetra Tech native .xlsx for final precision
    • Some LS items show in OCR with no unit cost or quantity; cost is the total
    • Decorative/custom items not in standard ODOT tables may have slightly different labeling across pages
    • Corridors omit RIGHT_OF_WAY, LIGHTING, TRAFFIC_CONTROL, LANDSCAPING sections
    • Small-text unit rates (e.g., $2/gal) less reliable than large-text subtotals
  • recommended_next_steps
    • Cross-check high-quantity items (excavation, asphalt CY) against actual site survey
    • Verify Design cost is actually 12-15% (vs. fixed fee) in original spreadsheet
    • Confirm whether decorative pavement (truck apron) appears on all roundabouts or is site-specific
    • Clarify whether DRAINAGE LS items ($100k-$150k) include detention basin or are just site drainage
    • Obtain original Tetra Tech .xlsx for definitive line-item costs; this YAML is investigative/analytical extraction
aedg/roundabouts.detail.opc.yaml · · aedg