Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
Extension narrative · #233 · the cost of opacity

The ledger, as a band you can move

The whole assessment hinges on four withheld or non-binding inputs: the building share of the $500M, the real job count, whether the campus takes the sales-tax exemption, and the School District Compensation the county won't disclose. None is invented here; each is turned across its industry-reference band (industry reference, not this campus). The simulator prices the opacity — and shows, record by record, exactly how much disclosure would narrow it.

Net 15-year public give: $71.8M – $89.2M for ~50 jobs — about 0.1% of the county's 49,690 covered jobs (2024). Full essay: the economic ledger →