Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →

← Entities

Entity · individual

Google

[verified] ◉ View in graph
Watershed points
1
Lima
Graph degree
3
3 out · 0 in · 3 neighbors
Record roles
6
meeting participant
Federal obligations
$73,521,961.77
Classification
[verified]
individual
UEI
[verified]
NQV3T7DDKNT6

Graph neighborhood

  • discussed_at → American Township (american-township/meetings/meeting-summaries.yaml)
  • discussed_at → Lacrpc (lacrpc/meetings/meeting-summaries.yaml)
  • discussed_at → Perry Township (perry-township/meetings/meeting-summaries.yaml)

View this neighborhood in the interactive graph →

Glossary terms whose entries name this entity.

Sources

  • american-township/meetings/meeting-summaries.yaml
  • data/reference/usaspending/awards.yaml
  • lacrpc/meetings/meeting-summaries.yaml
  • perry-township/meetings/meeting-summaries.yaml