Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →

← Concepts

Concept · term

RTO

regional transmission organizationISOindependent system operator

The independent operator that runs the transmission grid and wholesale energy market for a multi-state region — PJM in this record.

[verified]
  • energy
  • grid
  • market

A regional transmission organization is an independent, FERC-regulated entity that operates the high-voltage grid and wholesale electricity market for a region, keeping the transmission system neutral among the utilities and generators that use it. An independent system operator (ISO) is the functionally equivalent term; the label differs by region but the role is the same.

The RTO is the level at which grid capacity is actually allocated, through the interconnection queue and capacity market it administers. For this record the RTO is PJM, and its rules — set under FERC tariffs — determine how quickly a new hyperscale load or a behind-the-meter plant can connect, and what it must pay to do so. Understanding the RTO's process is what turns a vague "grid constraint" into a specific, dated position in a queue.

Ask this concept

Search the corpus around RTO — the records, entities, and open questions in its neighborhood. Results are cited corpus nodes, not a written answer; for a drafted answer over the whole record, use the site-wide Ask.