Watermark.
Van Wert
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

Power & ratepayers

Whose grid this load lands on, and what it does to the households on the same wires.

Partial
  • the campus load is a screening bracket — the demand-pressure read is withheld until an instrument grounds it

Every megawatt figure about a data center sits over a denominator, and that denominator is somebody's grid. A real impact study names the grid and cites the source. It then states what the campus load does to the households on the same wires.

Whose grid this is

Link Identification Evidence
Serving retail utility AEP Ohio (Ohio Power Company) [reference]
Holding company American Electric Power (AEP) [reference]
Balancing authority PJM Interconnection [reference]
Wholesale market (RTO/ISO) PJM Interconnection (RTO/ISO) [reference]
Retail rate regulator Public Utilities Commission of Ohio (PUCO) [reference]

What those systems already carry

System Annual load Campus share
AEP Ohio (Ohio Power Company) 48,653 GWh/yr 10.74%
PJM Interconnection 815,056 GWh/yr 0.64%
State retail sales 161,934 GWh/yr 3.23%

The disclosed campus draws ~663 MW — at a 0.9 load factor, ~5,223 GWh/yr, the numerator of every share above. The draw is itself an [inference].

The campus against consumer prices

The demand → consumer-price read needs an instrument-grounded campus load — an air permit or a filed disclosure. This site's load is a screening bracket, so the read is withheld rather than computed off an inference — the gap panel below names the instrument that would ground it.

  • Grid foundation layer (#94). The state, AEP Ohio (Ohio Power Company), and PJM denominators are now all connector-sourced — Ohio retail from EIA (shared with #91), per-utility retail from the EIA-861 file, and PJM annual demand from EIA-930. The campus is a single load equal to a material fraction of its serving utility's entire retail sales. Denominator vintages differ (utility EIA-861 2024 / BA EIA-930 2024 / state EIA 2025 (1-year spread)): the EIA state seriesid route publishes ahead of the EIA-861 bulk file and the EIA-930 annual sum, so the three shares are not struck against one common year.

The cited service chain with its full citations, the cohort-price qualification, and the load report's inference chain are in the grid annex.

The record behind this chapter

What this chapter stands on: the records it reads, the inputs its modeled figures rest on, and the reference data behind its baselines — the same pages the record screens serve, not a second copy. A figure the record does not support stays [open] and links nothing.

Reference data