The impact study Van Wert never received
The environmental and economic study that should precede any abatement or rezoning — assembled from the public record. Where the record is silent, the silence is the finding.
Confirmed Van Wert Mega Site · QTS Data Centers (QTS Realty Trust Inc. — Blackstone); developer Thor Equities Group
6 of 15 chapters on the record · 4 partial · 5 gaps named
Evidence tags
- [verified]
- Read from a cited record or a live source — confirmed and reproducible.
- [inference]
- A labelled reading or derivation from cited inputs — reasoning, not a record.
- [reference]
- An outside published specification or dataset — authoritative, but not a record about this site.
- [open]
- Withheld, unresolved, or not yet checked — a question, not a verdict.
Every figure in this study wears one of these tags. A chapter's verdict — On the record · Partial · Gap · Watch — measures the record, never the project's press.
The project
What this study is, how it reads evidence, and the project on the record.
- 01 Scope & method What a real impact study is, who normally commissions one, and how this one reads evidence. On the record
- 02 The project on the record Operator, lifecycle, load, cooling, and footprint — every undisclosed field a named blank. the IT load on the record is a screening bracket, not an instrument-grounded figure Partial
- 03 Land assembly & the deal How the land was put together, by whom, and what the paper trail says about when. the record carries no conveyance instrument — the land history has not been produced for this site Partial
The environment
Water, heat, groundwater, runoff, and air — each screened where the record allows.
- 04 Water supply & consumptive use How much water the project consumes, against the receiving water's own cited low flows. On the record
- 05 The discharge & the receiving water Dilution at the design low flows, and the burden the receiving water already carries. On the record
- 06 Heat The discharge's heat against the reach's temperature criterion at design low flow. a thermal characterization for this project — none exists on the record. Gap
- 07 Groundwater & dewatering The wells within reach of the site's pumping, and where the pumped water went. a well survey and any dewatering record — neither has been produced. Gap
- 08 Stormwater & the built surface The runoff a campus-scale impervious surface adds to the design storm. the site grading and drainage plan — requested, not produced. Gap
- 09 Air The dispersion footprint of the campus's permitted generator fleet. an air-permit application for this project — none is on the record. Gap
The economy
The labor baseline, the grid and its ratepayers, the fiscal trade, and the balance.
- 10 Labor & the local baseline What this economy is before the project — the denominator every jobs claim divides by. On the record
- 11 Power & ratepayers Whose grid this load lands on, and what it does to the households on the same wires. the campus load is a screening bracket — the demand-pressure read is withheld until an instrument grounds it Partial
- 12 The fiscal trade What tax revenue is being traded away, for how long, and what the paper trail says. no fiscal accounting and no incentive instrument is on the record Gap
- 13 Governance & the local record The ordinances, resolutions, votes, and minutes that approved — or refused — the project. On the record
- 14 The public balance What the community gives against what it is documented to get — a verdict over the chapters. synthesizes the screened chapters — 3 on the record, 1 partial, 4 gap Partial
What's missing
Every gap this study names, as one inventory — each with the record that would close it.