Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →

← Concepts

Concept · term

PTI

permit to install

Ohio EPA's pre-construction permit for a new or modified source of air or water pollution, issued before ground is broken.

[verified]
  • permitting
  • air
  • water

A permit to install is the Ohio EPA authorization a project must obtain before it builds or modifies a source of pollution — a treatment unit, an outfall, an air-emitting process. It is the pre-construction counterpart to an operating permit: the PTI reviews the design, while an operating permit governs the source once it runs — where applicable an NPDES permit for a water discharge, and for air a Title V permit for a major source or a permit-to-install-and-operate (PTIO) for a smaller one.

The PTI is often the earliest hard document in a facility's public trail, because it predates operation. For a data-center campus, a permit-to-install application can surface the on-site combustion, backup generation, or wastewater handling before the operator has said anything publicly — which is why the platform treats a PTI as a high-value discovery target alongside the construction general permit that covers its stormwater during the build.