Watermark.
Urbana
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

The gap inventory

Every gap this study names, with the record that would close it and where to send it.

On the record

This page collects every ask the study makes: 6 gaps named across 6 chapters. Each ask names a public record that an office could produce tomorrow. Each is the same ask the site's leads board already tracks, never a second copy of it. An absence on this page is a finding, not a locked door.

What this study cannot compute yet

A real impact study would report how much water this project consumes at buildout — monthly, against the receiving water's cited design low flows. [open]

Computing it requires a metered, contracted or permit-grounded water quantity — the cooling method is disclosed here, but no quantity is.

A real impact study would report how much heat the discharge adds to a reach screened against Ohio's numeric temperature criterion at its design low flows. [open]

Computing it requires a thermal characterization for this project — none exists on the record.

A real impact study would report the wells within the drawdown radius, and whether construction dewatering was permitted and where the water went. [open]

Computing it requires a well survey and any dewatering record — neither has been produced.

A real impact study would report the dispersion footprint of the campus's permitted backup-generator fleet. [open]

Computing it requires an air-permit application for this project — none is on the record.

A real impact study would report the campus's share of the serving utility's, balancing authority's, and state's annual load, from a grounded load figure. [open]

Computing it requires an instrument that grounds the IT load — an air permit or an interconnection filing; the load on the record is a screening bracket.

The site's open questions beyond these chapters

  • [open] Urbana pre-committed to de-annex the data-center land on the developer's demand — and the executed agreement is not public Ordinance 4612-24 Exhibit A · data/documents/urbana/council/2024-11-19_regular_meeting_packet.pdf pp.182-188 · data/extracted/urbana/incentive-instruments.yaml
  • [open] Resolve Urbana0624C, LLC — the City calls it "Highland", but no corporate filing has been read City of Urbana public notice + Ord. 4612-24 Exhibit A · data/extracted/urbana/incentive-instruments.yaml counterparty
  • [open] The "office building" water claim is untestable by any state instrument — and the City holds the only record that could settle it data/extracted/urbana/cooling-water-account.md · data/reference/oepa/cooling-reconciliation.yaml (route_blind row) · data/reference/ohio-water-withdrawal/champaign.yaml · Ord. 4612-24 Exhibit A in data/documents/urbana/council/
  • [open] No abatement exists — and most of the Thor assembly is outside the CRA it is associated with Ordinance 4631-25 + Exhibit B · data/documents/urbana/council/2025-11-04_regular_meeting_packet.pdf · data/extracted/urbana/incentive-instruments.md
  • [open] Thor v. City of Urbana (S.D. Ohio 3:26-cv-00196) — federal suit over the data-center zoning reversal is live Complaint, Thor Equities et al. v. City of Urbana, No. 3:26-cv-00196-MJN-CHG (S.D. Ohio, 2026-06-19) · data/extracted/urbana/litigation-thor-v-urbana.yaml
  • [open] Capture the Champaign County Common Pleas administrative appeal (the second Thor v. Urbana case) Complaint ¶¶71–72 (3:26-cv-00196) · data/extracted/urbana/litigation-thor-v-urbana.yaml companion_case

The full board, with lifecycle and filters, is at open leads and open questions.

Sections of the site still awaiting a source

Distinct from the study's gaps: these are whole sections of the record that have not opened yet — the needs board's asks, not the study's.