Watermark.
Urbana
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live
Lens 03 of 5

Environment

What does it take from and put into the ground, water, and air?

Mad River · Great Miami
The reading right now Open the water screen →

No buildout cooling scenario has been run for Urbana yet, so this lens has no dilution reading of its own — and it will not borrow the reference build's river. The doors below open what the site's bundle does carry; the water screen turns on when a cited design low flow and a disclosed cooling demand land.

Withdrawal, discharge, drawdown, runoff, heat, and toxics — the receiving water and air, screened against the criteria that actually govern them. Where the record brackets a figure rather than settling it, the bracket stands as the answer.

Still awaiting a source here: Groundwater · Seasonal withdrawal · Water flow · Thermal / §316(a) · Air dispersion. Each opens the moment Urbana's own record carries it — none is filled in from another site's.