Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

The grid backdrop

Every megawatt figure about a data center is a number over a denominator, and the denominator is somebody's grid. This is that grid for this site: who delivers the retail power, which balancing authority keeps it in balance, who regulates the rate — each one cited, not asserted — and how much electricity those systems already move in a year. It describes the place, so it stands whether or not a campus is ever built here. The prose companion is Economics — demand & public benefits.

The electric-service chain

LinkIdentificationEvidence
Serving retail utility Dayton Power & Light Co EIA-861 2024 Service_Territory: Dayton Power & Light Co (AES Ohio, #4922) is the IOU serving Champaign County, OH — the Urbana LSE (no municipal electric). [verified] [reference]
Holding company The AES Corporation (AES Ohio) Dayton Power & Light Co does business as AES Ohio, the Ohio operating company of The AES Corporation [reference]
Balancing authority PJM Interconnection PJM is the FERC-jurisdictional wholesale-market RTO for Dayton Power & Light (AES Ohio) [reference]
Wholesale market (RTO/ISO) PJM Interconnection (RTO/ISO) PJM is the FERC-jurisdictional wholesale-market RTO for Dayton Power & Light (AES Ohio) [reference]
Retail rate regulator Public Utilities Commission of Ohio (PUCO) Ohio retail electric service is PUCO-regulated (intrastate) [reference]

What those systems already carry

The load denominators, connector-sourced from the EIA. These are the figures a campus share is expressed against — and the only copy of them: the load report divides by this same feed rather than its own constants.

System Annual load Campus share
Dayton Power & Light Co EIA-861 2024 Sales to Ultimate Customers, Dayton Power & Light Co (#4922), OH; bundled + delivery total sales 13,818 GWh/yr 5.65%
PJM Interconnection EIA-930 daily demand sum, PJM 2024 (366 days, Eastern tz) 815,056 GWh/yr 0.10%
State retail sales EIA ELEC.SALES.OH-ALL.A (2025); shared with #91 161,934 GWh/yr 0.48%

Dayton Power & Light Co is Investor Owned (EIA-861). It serves ~540,836 retail customers.

Its bundled standard-service customers pay an average of 14.94¢/kWh. That is a cohort price — the customers who never shopped for a competitive supplier, which skews residential — not the utility's all-sector average, and not the rate a large industrial or data-center load pays. EIA-861 2024 Sales to Ultimate Customers, Dayton Power & Light Co (#4922), OH; COHORT PRICE — bundled (standard-service-offer) revenue/sales only. Delivery-only rows are excluded because they carry just the wires charge (generation is paid to a competitive supplier), but the remaining bundled cohort is the customers who never shopped, which in a restructured state skews residential. NOT the utility's all-sector average and NOT an industrial/data-center rate — for that, compare the all-sector price EIA ELEC.PRICE.OH-ALL.A

The disclosed campus draws ~99 MW, which at a 0.9 load factor is ~781 GWh/yr — the numerator of every share in the table above. That draw is itself an [inference].

Grid foundation layer (#94). The state, Dayton Power & Light Co, and PJM denominators are now all connector-sourced — Ohio retail from EIA (shared with #91), per-utility retail from the EIA-861 file, and PJM annual demand from EIA-930. The campus is a single load equal to a material fraction of its serving utility's entire retail sales. Denominator vintages differ (utility EIA-861 2024 / BA EIA-930 2024 / state EIA 2025 (1-year spread)): the EIA state seriesid route publishes ahead of the EIA-861 bulk file and the EIA-930 annual sum, so the three shares are not struck against one common year.

The campus against consumer prices

The demand → consumer-price sensitivity needs an instrument-grounded campus load — an air permit or a filed disclosure. This site has none yet (a screening estimate is a bracket, not a load), so the sensitivity is withheld rather than computed off an inference. Have the disclosure? Submit it →