Water supply & consumptive use
How much water the project consumes, against the receiving water's own cited low flows.
- cooling method undisclosed — but the water quantity is CONTRACTED, so the figures are a stated account rather than a bracketed range; what stays open is how the heat is rejected, not how much water it takes
A real impact study states how much water AWS Sidney Data Center Campus consumes at buildout. It sets that figure against the Great Miami River's own cited design low flows, which are the drought floors a permit writer screens every discharge against. This chapter reports as much of that comparison as the record supports. It names what it cannot compute.
Cooling methodnot disclosed [open] a facility is on the record here; no record says how it rejects heat
The water figure is a bracket, and that is the finding
No record discloses how AWS Sidney Data Center Campus rejects heat, so its consumptive water figure is a range across candidate cooling archetypes — 0 MGD (closed-loop dry) to 4.03 MGD (evaporative tower) — not an estimate. A single headline would fabricate the site's most load-bearing number; the bracket stands until the method is on the record.
baseline
Current municipal loop, no data-center cooling draw.
- The draw is set against the receiving water's cited design low flow as a worst-case, basin-scale bound — a screening comparison, not a withdrawal claim.
The record behind this chapter
What this chapter stands on: the records it reads, the inputs its modeled figures rest
on, and the reference data behind its baselines — the same pages the record screens
serve, not a second copy. A figure the record does not support stays [open] and links nothing.
- 1PD00009.c43b66fd.pdfOhio EPA
- City of Sidney WWTPPermits
- Sidney "Sidney Data Center Campus" / Project Rey — the City's incentive, service and development instruments, as executedIncentive packages
- City of Sidney Resolution No. 26-26 — authorizing the City Manager to enter into a Water and Wastewater Service Agreement with Amazon Web Services, Inc., passed 2026-04-27Local legislation
- Permits6 records